Employee ID | 10381 |
Date of Joining | 02-11-2022 |
Nature of Association | Contractual |
Department | Civil Engineering |
Designation | Assistant Professor |
Educational Qualification | M.Tech (Structural),B.E. (CIVIL) |
ankush.haldkar@bitdurg.ac.in | |
Contact Number | Extension No. : 409 |
Construction Materials , Structure analysis, steel design, geotechnical engineering
Journal Publications
1.Ankush Haldkar ,Dr.S.K Jaiswal , Dr. Nishant Yadav “– Optimizing lime powder dose to produce robust concrete usingrice husk ash as partial replacement of cement” GIS SCIENCE JOURNAL” Volume 9,Issue 1 Jan 2022
2.Ankush Haldkar and Dr. S.K. Jaiswal “A review paper– Optimizing lime powder dose to produce robust concrete usingrice husk ash as partial replacement of cement.” BITCON 2021
National Conference
Ankush Haldkar, – “Optimizing lime powder dose to produce robust concrete usingrice husk ash as partial replacement of cement” (BITCON 2022), October 2022.
MAJOR COURSES/ WORKSHOPS ATTENDED
1. AUTOCAD
2. 3D CIVIL
3. FDP FUSION360 AUTODESK BIT DURG
4. FDP ON "TRENDING SOFTWARE IN CIVIL ENGINEERING" 1 WEEK BY ACE ENGINEERING COLLEGE HYDRABAD
Other Responsibilities:
Site updation incharge of civil department
Felowship/Awards/Other recognitions:
As a Guest Lecture at CSVTU , Bhilai in the Field Of "INDUSTRIAL SAFETY AND FIRE SAFETY" for SWAYAM COURSE
1.Safety in Typical Civil Structures https://drive.google.com/file/d/1_EToLkhD13S0giFtlhKayhsw8gOmPevu/view?usp=drivesdk
2.Safety in Dams - Bridges https://drive.google.com/file/d/1PwGBJhiUhiAfe-xUID39g1xdkvPR811r/view?usp=drivesdk
3.Safety in Water Tanks
https://drive.google.com/file/d/1ir-H0BvbvNaOW9XlfPGjUGJBo3l8VrOt/view?usp=drivesdk
4.Safety in Retaining Walls
https://drive.google.com/file/d/1sdmu-0638jke6Z0QhQf4DzPQW4gWRv3v/view?usp=drivesdk
5.Critical factors for failure https://drive.google.com/file/d/1VWhKX7MnXZfd40vaQxjBAn1pO3ydRyfR/view?usp=drivesdk
6.Regular Inspection and Monitoring https://drive.google.com/file/d/1YR6bDhBB-2xncqGcwxqBZbnU9ZqOBwRI/view?usp=drivesdk
7.Managing Noise And Demolition Risk
8.Noise And Vibration Managment plan